Back to all resources

ClickUp Views Explained: Which One to Use and When

June 26, 2026

ClickUp has over 15 views and most teams use two by accident. A UK ClickUp consultant explains what each view is for and how to set up the right ones.

The ClickUp feature with the most options and the least explanation

Every ClickUp workspace has views. Most workspaces have too many of them. Almost nobody on the team uses more than two or three. And the ones they do use are usually whichever ones were there by default, not necessarily the ones that would actually help them most.

This is not a feature problem. ClickUp's views are excellent. It is an orientation problem. There are over 15 view types and nobody explains which one to use for what.

As a ClickUp Verified Consultant working with teams across the UK, here is the plain-English guide to ClickUp views: what each one is for, who should use it, and how to set your workspace up so people open the right view without having to think about it.

What a ClickUp view actually is

A view is a lens on your tasks. The tasks themselves do not change based on which view you are in. What changes is how you see them — what information is displayed, how it is organised, and what filters are applied.

You can have multiple views saved on the same List, each showing the same tasks in a different format. The account manager might open Board view to see where a project stands. The team member might open List view to see what they need to do today. The director might open Dashboard view to see how all projects are performing. Same data, different lenses.

The six views that do the most work for most teams

List view — the default workhorse

The most versatile view in ClickUp. Tasks displayed in rows with columns showing Custom Fields, assignees, due dates, priorities, and statuses. Good for: reviewing task details, bulk editing multiple tasks, sorting by any field, and day-to-day task management.

Who uses it: anyone who needs to work with the detail of individual tasks. Most team members spend most of their time in List view.

One thing to configure: add only the columns you actually use. The default column set often includes fields your team never fills in. Every unnecessary column is visual noise that slows people down.

Board view — the workflow tracker

Tasks displayed as cards in columns, organised by status. Each column is a workflow stage. You can drag cards between columns to move tasks through the workflow. Good for: seeing where work sits across all stages of a process, tracking what is stuck in which stage, and running a weekly project review.

Who uses it: team leads and project managers who need to see workflow status without reading through every task. This is the view you open on a shared screen during standup.

One thing to configure: filter Board view to show only tasks assigned to the current user or tasks in active stages. An unfiltered Board with 80 cards is less useful than a filtered one with 15.

Calendar view — the deadline manager

Tasks displayed on a calendar grid by due date. Good for: understanding workload distribution over time, spotting weeks with too many deadlines, and planning ahead.

Who uses it: anyone managing their own workload or scheduling delivery across a project. Particularly useful for account managers tracking client deliverables.

One thing to note: Calendar view only shows tasks with due dates. Tasks without due dates will not appear. Before using Calendar view as your primary view, make sure your team has a habit of adding due dates to tasks.

Table view — the spreadsheet replacement

Tasks displayed in a dense grid similar to a spreadsheet, with every Custom Field visible as a column. Good for: bulk data entry, comparing values across many tasks, and reporting that needs to show multiple fields side by side.

Who uses it: ops people building reports, finance tracking billable hours, and anyone who needs to review or edit many tasks simultaneously. Not a day-to-day view for most people.

Workload view — the capacity tracker

Shows each team member's assigned tasks across a time period, letting you see who is over-capacity and who has bandwidth. Good for: resource planning, catching workload imbalances before they become delivery problems, and planning new work assignments realistically.

Who uses it: team leads and operations managers. Requires tasks to have assignees and due dates to be useful. Requires the Business plan or above.

Gantt view — the timeline planner

Tasks displayed as horizontal bars on a timeline, showing how they relate to each other over time. Good for: project planning with dependencies, communicating project timelines to clients or stakeholders, and managing complex delivery schedules.

Who uses it: project managers working on time-sensitive deliverables with dependencies between tasks. Not useful for teams without clear task dependencies or for day-to-day task management.

The views most teams do not need

ClickUp has additional views including Map, Mind Map, Activity, Box, Chat, and Embed. These are useful in specific contexts but add clutter for teams that do not have a clear use case for them. The rule of thumb: if you cannot explain in one sentence why a view exists in your workspace, delete it or hide it.

How to set views up properly

The mistake most workspaces make: adding a view for every possible use case and leaving them all visible. The result is a tab bar with eight views that nobody knows which to open.

The better approach: decide which two or three views each List needs and save only those. Then save a filtered version of each view for each main role on your team. An account manager gets a filtered Board view showing their clients. A delivery lead gets a filtered List view showing tasks due this week. Each person opens the view built for their role without needing to figure out the filters themselves.

Views can be set as the default for a List, so the right view opens automatically. Set the default to whichever view the majority of the team uses most.

Frequently asked questions

How many ClickUp views are there?
ClickUp has over 15 view types. Most teams work well with two or three that match how they think about their work. More views is not better.

What is the best ClickUp view for project management?
It depends on what you are trying to see. List view for task management and detail. Board view for workflow stage tracking. Calendar view for deadline management. Most project managers use a combination of two or three.

Can different people have different ClickUp views?
Yes. Views can be shared with the whole team or saved as private views visible only to you. Each person can use views built for their specific role while the underlying task data stays shared.


Almost done! When you're ready, here are four ways I can help you:

  1. Read it. A guide on how to use ClickUp and actually make it work for you.
  2. Connect it. Let's be LinkedIn pals. I make funny videos sometimes.
  3. Workshop it. Book a 30-minute chat to talk processes and build a Miro together.
  4. Go for it. Fill in my contact form — let's talk ClickUp or Automations. Whatever tickles your pickle.

Wanna hear from the unfiltered version of me? Sign up to my newsletter. The Working Notes. 2 minute reads. Behind the scenes. Hopefully helpful. Maybe funny.

Read more resources

July 30, 2026

Automation Agency East Anglia: Where Toki Works Beyond Norwich

Looking for an automation agency covering East Anglia? Toki is based in Norwich and works with businesses across Norfolk, Suffolk, Cambridgeshire and beyond.

Read More
July 29, 2026

ClickUp Consultant Norfolk: Local Automation Support for Norfolk Businesses

Looking for a ClickUp consultant in Norfolk? Toki is a ClickUp Verified Consultant based in Norwich, working in person and remotely across the county.

Read More
July 28, 2026

Meet Toki: The Norwich Automation Consultancy Behind the ClickUp & Zapier Builds

Who is Toki? A Norwich automation consultancy founded by Jack Lenton, ClickUp Verified Consultant and Zapier Silver Solutions Partner. Here's what that means.

Read More